Metal scaffolding 2014

Published by Diego Minato from RevitLandia on 12/16/2016

Designed to allow construction workers access to all the higher points of a building under construction or repair, this BIM metal scaffolding is made up of bridges, walkways and platforms. Each part ...

Designed to allow construction workers access to all the higher points of a building under construction or repair, this BIM metal scaffolding is made up of bridges, walkways and platforms. Each part of the scaffolding assembly is available for download in the Revit 2014 format (.rfa.). A test file in the .rvt format contains all the graphic settings. It is also available in the Revit 2009 version upon request from creator Diego Minato.

Read more Read Less
ponteggi ponteggio scaffold
  • Information
  • Photos 0
  • 3D Models 0
  • 2D Models
  • Documentation 1
  • Properties & Variants 0
  • Classifications 4
  • Distribution Countries
  • Bloc In Bloc
FilenameFile extensionSizeSoftwareLevel Of Details (LOD)Uploaded by
FilenameFile extensionSizeSoftwareLevel Of Details (LOD)Uploaded by

BIM&CO Stored Documents

Document nameTypeDocument language

Name of external documentTypeDocument language

BIM object properties